Turn a 45Q credit claim into a mass balance a reviewer can follow.

A 45Q claim is only as strong as the evidence behind it. haql-45q reconciles capture, injection, monitoring and lab records, prices the stored tonnes at the statutory rate for the construction year, tracks the Subpart RR reporting clock (the US EPA rule for geologic sequestration), and packages the evidence.

45Q credit evidenceoffline and deterministiccertification pack

Product: haql-45q · Public guide · Updated 8 November 2026

What haql-45q does

The US 45Q tax credit supports carbon capture and storage (CCS). A claim needs more than a total: it needs a defensible mass balance, a consistent storage formation, complete reporting periods and the correct rate basis. haql-45q checks those links before a reviewer does.

In one sentence: It turns a credit calculation into a reviewed, traceable evidence pack.

Carbon capture and storage (CCS) operators

Prepare the claim

Reconcile the year and see the gaps before the certification pack is filed.

MRV and compliance teams

Follow the chain

Trace stored and vented tonnes to the rows and quarters behind them.

Finance and tax teams

Check the basis

See the rate basis and the reporting clock in the same output as the mass balance.

Why it matters

Calculating a dollar value per tonne is arithmetic. Surviving review is harder: a vented tonne that never reached the balance, an injection row outside the storage formation, or a missing monitoring quarter can undermine the claim.

  • A vent or leak recorded in monitoring can be left out of the stored-tonne calculation.
  • Injection can be attributed to the wrong formation or interval.
  • A missing monitoring or lab quarter makes the year incomplete before it is filed.
  • The wrong construction-year rate table can restate the entire schedule.
Without haql-45qThe hidden problem

The year is summed in a spreadsheet. Stored equals injected minus emitted. The reviewer asks for the formation, the quarters and the rate basis, and the evidence is scattered across four exports.

With haql-45qThe visible answer

The mass balance, the credit schedule, the reporting clock and the supporting evidence arrive as one inspection pack, with findings named before filing.

What goes in

The tool expects the records you already keep for the storage site. Missing files are treated as gaps, not silently estimated.

What goes inWhat it means
Capture CSVCaptured CO2 volumes and the activity records behind them.
Injection CSVInjection volumes, wells and the storage interval or formation.
Monitoring CSVMonitoring periods, vent or leak events and coverage.
Lab CSVSupporting lab or composition records where applicable.
Facility configurationStorage formation, construction and placed-in-service dates, disposition and the monitoring, reporting and verification (MRV) plan.

What comes out

The output is intended to answer a reviewer's questions in one place.

What comes outHow to use it
Credit scheduleStored tonnes priced year by year at the statutory rate for the construction year.
Mass balanceCaptured, injected, stored and vented tonnes reconciled across the year.
Subpart RR clockThe annual reporting due date computed from the applicable rule.
Certification packJSON and HTML evidence pack plus a credits.csv for audit.
Signed evidenceOptional Ed25519 attestation and a byte-reproducible inspection bundle.

What it checks

The checks cover the physical balance, the claim configuration and the reporting window.

Check areaWhat it flags
Mass-balance gapsCaptured CO2 that did not end up injected or vented beyond tolerance.
Negative stored tonnesVented emissions that exceed the stored claim.
Formation inconsistenciesInjection recorded outside the storage formation in the configuration.
Missing intervalsInjection rows that do not identify the storage interval or depth.
Incomplete periodsMissing monitoring or lab quarters that leave the year incomplete.
Credit window and rateConstruction or reporting outside the allowed window, or the wrong rate table.
Reporting clockThe Subpart RR annual report due date (the US EPA geologic sequestration rule), calculated rather than remembered.

Rule IDs and the full check list are shown on the product page and in the report, so a finding can be discussed without ambiguity.

What it does not do

A useful tool should be clear about its boundaries. These are the current limits, not hidden caveats.

  • It does not provide legal, tax or accounting advice; it produces evidence for a professional to review.
  • It depends on the completeness and accuracy of the capture, injection, monitoring and lab records you provide.
  • It does not integrate with an accounting or EHS platform; files are the interface.
  • The facility configuration — formation, dates, disposition and MRV plan — must reflect the actual project.

Findings are advisory. The tool names a contradiction or a risk with the evidence behind it. The engineering, legal or commercial judgement remains with you.

How to try it

Send one year of records for a free check, or run the standalone binary locally.

  1. Send the four exports and the facility configuration for a free review.
  2. Receive the mass balance, findings and credit schedule without a key or card.
  3. Use the certification pack to fix the gaps before the claim goes to review.

Access

AccessWhat you get
Sample checkFree. One year of records, no key and no card.
Team$349/month. Annual commitment, up to 10 users and unlimited facilities.
On-premise$1,750/month. Annual, per site, unlimited users on that site.

Nothing leaves your machine. The paid tools run offline. The free libraries have no account, cloud call or telemetry.

Common questions

Is this a tax-return or legal-opinion tool?

No. It reconciles the technical and documentary evidence behind a claim. Legal, tax and accounting judgements belong to the relevant professionals.

Does it support pre-IRA projects?

The rate schedule uses the statutory table for the construction year; a pre-IRA project is not silently priced at the full current rate.

What happens when a file is missing?

Missing files are treated as gaps and reported, not guessed around. A missing required column is an error.

What is 45Q?

A US tax credit for carbon capture and storage. The credit depends on proving how much CO2 was stored and under what rules. This tool builds the technical evidence, not the tax return.

What is Subpart RR?

The US EPA reporting rule for geologic sequestration. It sets the annual reporting clock and the storage-site evidence a claim should line up with.